fbpx

Stale Chips: Stellantis idles Windsor, Ont. minivan production until May 3

Windsor, Ontario — Stellantis, formerly known as Fiat Chrysler (FCA), will idle its minivan plant in Windsor, Ontario, until the end of April, due to the global microchip shortage.

Production is scheduled to resume May 3, the automaker said. The Chrysler Pacifica, Voyager, Grand Caravan and Pacifica Hybrid minivans are all built at the Windsor Assembly Plant.

Shutdowns of the Windsor, Ont. minivan plant and the company’s Brampton, Ont. plant began March 29.

The Brampton, Ontario, Assembly Plant–where the Chrysler 300, Dodge Challenger and Dodge Charger are assembled–is slated to resume production April 19.

AutoForecast Solutions said earlier this week that the production of 635,000 vehicles in North America has been lost to the chip shortage with a projected total of 831,000 to be lost this year.

 

SHARE VIA:
Facebook
LinkedIn
Twitter
Email

Sign-up for the Collision Repair daily e-zine and never miss a story –  SUBSCRIBE NOW FOR FREE!

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Arslan Accuvision
PlayPlay
Fix Conference
PlayPlay
Fix Canada Conference
PlayPlay
previous arrow
next arrow

Recent Products

Recent Posts

Stay on top of the latest INDUSTRY news and trends by subscribing to our daily e-zine!

Our other sites

Our other sites

Days
Hours
Minutes
Seconds